Apollo Victoria Theatre
Opened as a cinema in 1930, the Apollo Victoria is a 2,328-seat Art Deco theatre that has become a major West End musical venue. Over its long history it has hosted classic productions such as The Sound of Music, Camelot, and Fiddler on the Roof, later becoming home to Starlight Express from 1984. Since 2006, it has enjoyed continued success with the long-running hit Wicked.
PROJECT: Facade Refurbishment
Client: ATG Entertainment
Location: London
Principal Contractor: Roesewood
Project Value: £960,000
The Apollo Victoria Theatre, home to the acclaimed musical Wicked, was experiencing ongoing issues including damp and water ingress, loose concrete render, and failing masonry, which had been temporarily secured to protect the public. As part of the ATGE Façade Management Programme, several high-priority areas were identified requiring urgent and permanent repair to prevent further deterioration.
The scope of works addressed critical structural and fabric defects, including repairs to listed features such as the decorative bas-relief panels at the main entrance and the asphalt upstands to the canopy. Completion of these major refurbishment works significantly reduced the risk of falling debris, resolved long-standing damp issues, and safeguarded the theatre’s historic fabric while improving public safety.
CN Projects delivered comprehensive, in-depth Health & Safety site audits throughout the façade refurbishment works, providing detailed assessments of site conditions, work at height activities, and contractor compliance. The audits supported effective risk management, ensured alignment with CDM Regulations 2015 and HSE guidance, and helped maintain safe working practices within a live, complex theatre environment.
PROJECT: Dressing Room Refurbishment 2024
Client: ATG Entertainment
Location: London
Principal Contractor: Red Dot
Project Value: £972,000
This project involved the installation of air conditioning to all dressing rooms, together with the comprehensive refurbishment of 19 existing dressing rooms on Vauxhall Bridge Road and Wilton Road. Completed over a 37-week programme in 2024, the scope of works included soft strip demolition, overboarding of selected walls, installation of new suspended ceilings and flooring, reconfigured built-in furniture, and full redecoration throughout.
​
CN Projects was appointed to deliver the Principal Designer, CDM, and Project Management roles, ensuring the successful coordination of the design team, rigorous compliance with health and safety requirements, and effective control of programme, cost, and quality from inception through to completion.